Construction and installation Process
1 - Excavation of WWG basin + Control Box (by hand or by machine) |
 |
 |
 |
2 - Excavation of plumbing networks + drainage trenches (by hand or by machine) |
 |
 |
 |
 |
3- Water proofing of WWG basin (in clay, concrete o geomembrana) + its Control box
 |
 |
| WWG water level Control box |
 |
 |
WWG unit piping in place |
 |
 |
WWG unit water fill to check on waterproofness |
Gravel fill of WWG unit + Drain/Subsurface Irrigation trenches (by hand or by machine) |
 |
 |
WWG unit borders are covered by gravel, rocks, brick walls, or ...
 |
 |
 |
 |
WWG system is ready to be planted and connected to the building's plumbing |
| Planting |
 |
 |
A WWG unit 6 month later |
|